��Dongguan Professional Food Industrial Park��
[Phase II of the Huafeng Food Industrial Park Project in Dongkeng Town, Dongguan]
[Key Features]
��A food manufacturing industrial park specifically designed for food enterprises;
��2,280 sqm per floor, 100 meters in length, with flexible production line layouts;
��Includes environmental impact assessment, wastewater treatment plant, steam supply, natural gas, cold storage, joint testing center, joint sample retention center, workwear and linen laundry room, and direct access to cooking oil on each floor;
��Features dedicated loading docks and a logistics plaza, a 120-ton weighbridge, a cafeteria, apartment-style dormitories, a gym, a games room, a billiards hall, a multipurpose activity hall, a sports field, a convenience store, fast and slow charging stations, and ample above- and below-ground parking spaces;
��5-minute access to the expressway and Songshan Lake High-Tech Industrial Park; 30 minutes to downtown Dongguan; 60 minutes to core cities in the Greater Bay Area; 75 minutes to Shenzhen Airport;
��Scheduled for delivery in September 2026; the project is currently accepting pre-leasing applications.
[Key Focus Areas]
Food Processing: Bakery and pastries, snack foods, condiments, prepared meals, central kitchens, etc.
Supporting Industries: Food packaging, cold-chain logistics, testing and certification, food additives, food machinery R&D and manufacturing, etc.
【Color Master Plan】
[3D Rendering]
【Project Specifications】
Phases I and II of the Huafeng Food Industrial Park have a total floor area of 74,500 square meters. Phase I is already occupied by Sha Er Ge Food and Hitao E-commerce. Currently, Production Buildings 7 and 8, as well as Apartment/Dormitory Buildings 3 and 6 in Phase II, are available for lease. Specifications are as follows:
��【Phase II Production Buildings】
Building 7 — 13 stories, equipped with 1 x 5-ton freight elevator, 3 x 3-ton freight elevators, 2 x 1.6-ton passenger elevators, and 6 dedicated loading docks.
Building 8 — 6 stories, equipped with 1 x 3-ton freight elevator, 1 x 1.6-ton passenger elevator, and 2 dedicated loading docks.
|
Building 7
Floor |
Building 7 Area
( m² ) |
Building 8
Floor |
Building 8 Area
( sq m) |
Floor Height
(m) |
Load-bearing
(T) |
Remarks |
|
1F |
1920 |
1F |
/ |
7# 6m
8#4.8m |
3 |
1. The first floor of Building 8 serves as the loading/unloading, boiler, electrical distribution, engineering, and fire control area;
2. Both 7# and 8# can function as independent buildings. |
|
/ |
/ |
2F |
560 |
3.2 |
1 |
|
2F |
2280 |
3F |
680 |
5 |
1.5 |
|
3F |
2280 |
4F |
680 |
5 |
1 |
|
4F |
2280 |
5F |
680 |
5 |
1 |
|
5F |
2280 |
6F |
340 |
7# 5m
8# 3.6m |
1 |
|
6F |
2280 |
|
/ |
5 |
1 |
|
7F |
2280 |
|
/ |
5 |
1 |
|
8F |
2280 |
|
/ |
5 |
1 |
|
9F |
2280 |
|
/ |
5 |
1 |
|
10F |
2280 |
|
/ |
5 |
1 |
|
11F |
2280 |
|
/ |
5 |
1 |
|
12F |
2280 |
|
/ |
3.6 |
1 |
|
13F |
1410 |
|
/ |
3.6 |
1 |
|
Subtotal |
28,410 |
|
2,940 |
/ |
/ |
|
Total |
31,350 |
|
|
|
[Apartments 3 and 6] offer a total of 50 single rooms (large and small) and 50 one- and two-bedroom suites, including:
【Large Single Rooms】Accommodate 5–10 people, equipped with bunk beds, storage cabinets, a bathroom, a shower room, and a balcony;
【Small Single Room】Accommodates 1–2 people, equipped with bunk beds, storage cabinets, a desk, and a shared bathroom and shower room for two small single rooms;
【One-Bedroom】One bedroom, one living room, one kitchen, one bathroom, and one balcony; equipped with beds, a desk, a wardrobe, a dining table, chairs, a refrigerator, and an air conditioner;
【Two-Bedroom】Two bedrooms, one living room, one kitchen, one bathroom, and one balcony; equipped with beds, desks, wardrobes, a dining table, chairs, a sofa, a refrigerator, and an air conditioner.
【Support Services】
|
Includes comprehensive environmental impact assessment |
Sewage treatment plant with a daily capacity of 350 tons |
|
Steam |
Equipped with an 8-ton boiler (planned expansion of 6 tons), with a maximum of 5 tons available per floor |
|
Natural Gas |
Already connected to the industrial park and building |
|
Cold Storage |
2,100 m² (zone-controlled temperature), located on the 2nd and 1st floors of Building 7 |
|
Cooking Oil |
Central oil supply pipeline to the roof; individual storage units; dedicated oil distribution lines routed to each floor via designated pathways |
|
Loading Dock |
1.2-meter-high large-area platform equipped with 8 loading ramps |
|
Weighbridge |
The facility is equipped with one 120-ton truck scale |
|
Shared Resources |
Joint Inspection Center and Sample Retention Center; workwear and linen laundry room; regular business exchange salons for park enterprises (covering operational management, marketing channel resources, and supplier resource sharing and matching for packaging materials, etc.) |
|
Huafeng Fund |
The fund provides financial support to park enterprises using the owner’s own capital, offering short-term loans and long-term equity investments. |
|
Main Gates |
Two main entrance gates—East Gate and South Gate—which can be managed independently |
|
Floor Offices |
Each floor features a dedicated office area, with a private reception area as standard |
|
Parking Spaces |
200 parking spaces, including 103 underground spaces and 97 above-ground spaces (including 10 fast-charging stations) |
|
Multipurpose Hall |
Accommodates 30–300 people for meetings and team-building activities, equipped with stage lighting, projectors, audio equipment, conference tables and chairs, and a refreshment area |
|
Amenities |
Gym, game room, convenience store, basketball court, five-a-side soccer field, badminton court, table tennis court, billiards room, and multi-purpose restaurant (equipped with audiovisual entertainment, karaoke, and other facilities) |