Huafeng Food Industrial Park
Region: Guangdong-Dongguang
Address: Dongguan City—No. 13 Keji Road, Zone
State-Owned Enterprise Platforms
Property ownership
Empty
Infrastructure
Water price: Empty
Natural gas: Empty
Industrial electricity: Empty
Steam prices: Empty
Sewage treatment: Empty
Chat
Call
Investment Team
Familiar with market dynamics, good at digging out quality projects, and promote cooperation with professional services.
Call
Familiar with market dynamics, good at digging out quality projects, and promote cooperation with professional services.
Call
Factory
Warehouse
Office Building
Name
Floor Space
Unit Price
Floor Level
Height
Factory
Warehouse
Office Building
Name
Floor Space
Unit Price
Floor Level
Height
Park Overview
🔥Dongguan Professional Food Industrial Park🔥
[Phase II of the Huafeng Food Industrial Park in Dongkeng Town, Dongguan]
【Key Features】
🔥A food manufacturing industrial park professionally designed for food enterprises;
🔥Each floor spans 2,280 square meters and is 100 meters long, allowing for flexible production line layout;
🔥Equipped with environmental impact assessment approval, a wastewater treatment plant, steam, natural gas, cold storage, a joint testing center, a joint sample retention center, a workwear and linen laundry room, and direct access to cooking oil on each floor;
🔥 Professional loading docks and logistics plaza, 120-ton weighbridge, cafeteria, apartment dormitories, gym, card room, billiards room, multi-purpose activity hall, sports field, convenience store, fast and slow charging stations, and ample above-ground and underground parking spaces;
🔥5-minute access to the expressway and Songshan Lake High-Tech Industrial Park; 30 minutes to downtown Dongguan; 60 minutes to core cities in the Greater Bay Area; 75 minutes to Shenzhen Airport;
🔥Scheduled for delivery in September 2026; the project is currently accepting pre-leasing applications.
【Key Focus Areas】
Food Processing: Bakery and pastries, snack foods, condiments, prepared meals, central kitchens, etc.
Supporting Industries: Food packaging, cold-chain logistics, testing and certification, food additives, food machinery R&D and manufacturing, etc.
【Project Specifications】
Phases I and II of the Huafeng Food Industrial Park have a total gross floor area of 74,500 square meters. Phase I is already occupied by Sha’erge Food and Hitao E-commerce. Currently, Production Buildings 7 and 8, as well as Apartment/Dormitory Buildings 3 and 6 in Phase II, are available for lease. Specifications are as follows:
🏭【Phase II Production Buildings】
Building 7 — 13 stories; floor area of 2,280 square meters per floor, with a load capacity of 1 ton per square meter; ground floor height of 6 meters, other floors 5 meters high; equipped with 1 x 5-ton freight elevator, 3 x 3-ton freight elevators, 2 x 1.6-ton passenger elevators, and 6 specialized loading docks.
Building 8 — 6 stories;Floor area: 680 sqm; load capacity: 1 ton per sqm; ground floor height: 6 meters; other floors: 5 meters; equipped with 1 x 3-ton freight elevator, 1 x 1.6-ton passenger elevator, and 2 dedicated loading docks.

🏠【Apartment Dormitories 3 & 6】Offering a total of 50 large and small single rooms, as well as 50 one- and two-bedroom suites, including:
【Large Dorm Rooms】Accommodate 5–10 people, equipped with bunk beds, storage cabinets, a bathroom, a shower room, and a balcony;
【Small Dorm Rooms】Accommodate 1–2 people, equipped with a bunk bed, storage cabinets, a desk, and a shared bathroom and shower room for two rooms;
【One-Bedroom】One bedroom, one living room, one kitchen, one bathroom, and one balcony; equipped with beds, desks, wardrobes, dining tables, chairs, refrigerators, and air conditioners;
【Two-Bedroom】Two bedrooms, one living room, one kitchen, one bathroom, and one balcony; equipped with beds, desks, wardrobes, dining tables, chairs, sofas, refrigerators, and air conditioners.

【Supporting Facilities】
Comprehensive environmental assessment completed Wastewater treatment plant with a daily capacity of 350 tons
Steam Equipped with an 8-ton boiler (planned expansion of 6 tons); maximum supply to floors is 5 tons
Natural Gas Already connected to the building from the industrial park
Cold Storage 2,100 m² (zone-controlled temperature), located on the 2nd and 1st floors of Building 7
Cooking Oil Central oil pipeline to the roof; individual storage per unit; oil supply pipes follow designated routes to each floor
Loading Docks Large-area platforms 1.2 meters high, equipped with 8 loading ramps
Weighbridge 1 x 120-ton weighbridge installed in the park
Shared Resources Joint Testing Center and Sample Retention Center; workwear and linen laundry room; regular business exchange salons for park enterprises (covering operational management, marketing channel resources, and supplier matchmaking for packaging materials, etc.)
Huafeng Fund Provides financial support to park enterprises using the owner’s own capital, offering short-term loans and long-term equity investments.
Entrances Two main entrances (East Gate and South Gate) that can be managed independently
Floor Offices Each floor features a dedicated office area with a standard private reception area
Parking Spaces 200 parking spaces, including 103 underground and 97 above-ground (including 10 fast-charging spots)
Multifunctional Hall Accommodates 30–300 people for meetings and team-building activities, equipped with stage lighting, projectors, audio equipment, conference tables and chairs, and a refreshment area
Amenities Gym, card and board game room, convenience store, basketball court, five-a-side soccer field, badminton court, table tennis court, billiards room, and a multifunctional restaurant (equipped with audiovisual entertainment, karaoke, and other facilities)
Transportation Location
 Return to location
  • Highway
  • Port
  • Airport
  • Logistics
  • Life
region
trade
medical
school
travel