North side of South Street and west side of East Road at the Taige Mu Town Thermal Power Plant
Release time:
2026-03-25
number:
Tu Zuo Reserve Auction No. 2026 08
Listing
Mode of transfer
50.0 years
Years of assignment (years)
客场.直场
Total area (acres)
Industrial land
planned use
¥直.客直M
starting price
Basic information
Current Area
Inner Mongolia-Hohhot-Tumed Left Banner
Building density
40.0 ≤ Building Density
Green ratio
Green space ratio ≤ 30.0
placement
North side of South Street and west side of East Road at the Taige Mu Town Thermal Power Plant
Plot ratio
1.0 ≤ Floor Area Ratio
Floor Area
Empty
Limit height
≤24.0 meters
localities
North side of South Street and west side of East Road at the Taige Mu Town Thermal Power Plant
Transaction information
Tumed Left Banner price trends