West Lake Yunchuang Zhichen Park
Release Date: 2026-08-14
rent1yuan/m²·day
Min Lease5year
30000
Space (㎡)
6
Height (m)
Brick-Concrete
Structure
Multi-Story
Factory Floors
Ownership: State-Owned
Current Area: Zhejiang-Hangzhou-Xihu District
Address: 161 Gutao Street
Industrial Park:
‌Golden Land Weixin · Jiaxing Xiushui Lingchuang ParkDetails
Chat
Call
Project Overview
Floor
Level 11 (12 floors)
Load
1tons
Span (m)
8.4
Column Grid
length: 70m
;
width: 50m
Fire Rating
Class C-2
Fire Facilities
Sprinkler System;Smoke Detectors;Fire Hydrants
Transformers
5000kva
Voltage
380
Lighting
1lux
Cargo Elevators
2Units
Passenger Elevators
2Units
Core Advantages

Basic Project Information:

[Project Scale] Covering 78.3 mu, with a total floor area of 208,000 square meters and a leasable area of 108,000 square meters. The complex consists of four 4-story standalone high-standard industrial buildings,4 high-rise buildings (7–12 stories) suitable for industrial use and R&D offices, 3 park service and support buildings (150 talent apartments, a shared conference center, multifunctional meeting rooms, a corporate exhibition center, a cafeteria, a convenience store, a gym, etc.), and 1,458 parking spaces.

[Leasable Area Ranges]

4-Story Standalone Buildings:

Single Floor: 800–1,100–1,800

Entire Building: 3,000–4,200–6,400

Equipped with 1–2 passenger elevators + 1 3-metric-ton freight elevator

Ceiling Height: Ground Floor 6 m / 7.8 m, Second Floor 6 m, 3rd–4th Floors 4.5 m

7–12-story high-rise buildings:

7-story single-story: 1,300

12-story single-floor units: 490–1,000–1,500–2,000–3,000

Entire building: 8,400–16,800–30,000

Ceiling Height: Floors 1–3: 6 meters; Floors 4–5: 5.2 meters; Floors 6 and above: 4.2 meters

Equipped with 4 passenger elevators + 1 2-metric-ton freight elevator + 1 fire elevator

Load-bearing capacity: Floors 1–2: 1,000 kg/sq. m

Other floors: 500 kg/sq. m

[Rental Quote] Average price for the entire building is approximately 1.1 yuan/sq. m/day

[Property Management Fee] 5 yuan/sq. m/month

[Tenant Targeting] As an industry-academia-research support facility for West Lake University, the project leverages the university’s research strengths to facilitate the commercialization of research outcomes from top-tier research teams. The project focuses on building a hub in fields such as artificial intelligence, electronic information, smart equipment, the digital economy, new energy, and new materials.

Transportation Location
 Return to location
  • Highway
  • Port
  • Airport
  • Logistics
  • Life
region
trade
medical
school
travel
  • Associated Carrier